Construction of first phase of the Zohr gas field project will be completed in the coming month, Engineer Tarek al-Mulla, Minister of Oil and Mineral Wealth has announced.
Speaking while inspecting the final preparations for the mega project, Mr Mulla said that an intensive program had been set for the implementation of the project.
The minister called on the companies operating in the project to exert further efforts during this stage to accelerate works and necessary steps to start production.
Read:Egypt is top investment destination in Africa 2018
A high-profile team from Eni of Italy accompanied the minister during the inspection, noted the press release, which quoted Petropel chairman Atef Hassan as saying that pre-production tests are being conducted.
In 2016, the Egyptian Natural Gas Holding Co., awarded Italian energy firm Eni a contract to develop the Zohr gas field in the Shorouk Concession, offshore Egypt.
The contract was approved by the Egyptian Ministry of Petroleum and Mineral Resources and will see Eni ramp up production at the field to 75 million standard cubic meters of gas per day by 2019.
- The $725 Billion Backlog Play: Why Quanta Services and Comfort Systems Are the AI Construction Trade of 2026 - June 11, 2026
- US Inflation Hits 4.2% — Three-Year High Hammers Wall Street and Freezes Fed Rate Cuts - June 11, 2026
- Inside Estadio Azteca: The Architectural Marvel That Opened Three FIFA World Cups - June 11, 2026
